Hauled the fuse out the hangar and coated with LPS 3 to make room in the build garage for empennage. Following The Manual and plans.
Build order: bend LE and TEs, strap hinges, drawing and blocking, bending and fitting ribs,
Note: still have to fit the piano hinge to tab spars to then get proper fit on tab ribs.
Learning tons along the way. Knowing builders in my area with better tools than me has also helped keep making parts consistent.