I am looking at how to best install a pre fabricated smoke tank (smoking airplanes.com). The location is decided.The main tubing is square 0.035 wall. This tubing still seems rather hefty, so I am wanting to drill some lightening holes (vertically).With vertical holes, the tube is still plenty strong one way, but I am unsure about side loads. I believe smoke oil is about 8 pounds/gal, it would be a 3.5 gal tank.
Thoughts?
Here are some primitive pics:
Thoughts?
Here are some primitive pics:
![20091228_084800_smoke_tank_fuse.jpg](https://proxy.imagearchive.com/98e/98ee8311cc59d49c2b75da81648e8bac.jpg)
![20091228_084820_topview_smoketa.jpg](https://proxy.imagearchive.com/f78/f78f24c15f60b442475b8007328c3159.jpg)