I’m in the middle of rigging my elevator with the brace wires and stab strut. I’ve been fooling around with it and am getting binding of the elevator when I start putting tension in the wires. Looks like when I start tensioning the wires the aft spar on the horizontal stab is being pulled back causing the hinges to bind. Just wondering if anyone has the sequence of tackling the rigging of the tail?