• Become a Subscribing Member today!

    The Biplane Forum is a large global active community of biplane builders, owners and pilots. From Pitts to Skybolts, to older barnstormers, all types are welcome.

    The Biplane Forum is a private community. Subscriptions are only $49.99/year or $6.99/month to gain access to this great community and unmatched source of information not found anywhere else on the web.

    Why become a Subscribing Member?

    • In addition to our active community, our content boasts exhaustive technical information which is often sought after for projects and maintenance. This information has accumulated over the 12+ years the forum has been in existence.
    • We are also a great resource for non biplane users, since many GA aircraft are built the same way (fabric and tube construction).
    • Annual membership also comes with two BiplaneForum.com decals.

    Become a Subscribing Member and access the Biplane Forum in full!

    Subscribe Now

Pitts S-2A Plywood Leading Edges

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

bf92

Well-Known Member
Lifetime Supporter
Joined
Jan 1, 2008
Messages
2,034
Reaction score
994
The lower left wing leading edge formed and drying for three days before installation. It really isn't that difficult to form these around the nose ribs. I soak them in plain water for at least three days to soften them. Then I staple the skin along one edge of the spar, then along each rib from spar to tip, then wrapped the skin over the nose with bungee cords to hold in a loose bend. Then ratchet straps are used to begin pulling the skin down tight. I then staple from the nose towards the spar to make the skin tight against the ribs, and finally along the spar. The plywood fits nice and tight while drying, and has way less spring-back than the metal leading edges do.

Danny
1734485980549.png
 

Latest posts

Back
Top